Transforming your infrastructure. Maximising your investment.
5 products
Refurbishment of bus shelters not only includes preparing and treating existing frames, panels, furniture, gaskets and fixings, but also replacement panels and often relocation of shelters too. Talk to us about revitalising your shelters as well as handling any groundworks associated with relocations.
Refurbishment work usually takes place at the site and if required we relocate the shelter to its new site before starting on the overhaul. We manage the works to ensure minimum disruption to services, pedestrians and road users. The best time for refurbishments is during the drier months – from April to October.
Refurbishing shelters is the ideal opportunity to install a ‘Green’ living roof retrospectively. After a survey to confirm the structural integrity of the shelter, a ‘Green’ roof can be fitted to most shelters, to improve air quality and contribute positively to your environmental and sustainability goals.
Alongside the more modern, aluminium panelled shelters, we can take great pride in restoring brick and wood-built shelters, restoring them to their former glory.
We use cookies to understand how our site is used and to measure our advertising. You choose which to allow.
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper function of the website.
You can find more information in our Cookie Policy and Privacy Policy.