Case Study

Transforming travel experiences, enhancing public transport and promoting sustainability

Bespoke Shelter for Gosport Interchange

Design, build and install a bespoke shelter for the Gosport Interchange Improvement Scheme

Client: Hampshire County Council

Key Stakeholders: Gosport Borough Council, Knights Brown

Hampshire County Council undertook the Gosport Interchange Improvement Scheme to modernise bus and taxi facilities at the Gosport Ferry Terminal, a vital transportation hub linking Portsmouth Harbour and surrounding areas. The project aimed to enhance public transport infrastructure, prioritise pedestrian safety, and align with sustainability goals.

Funding and Scope

The £5.9 million project was funded through the Department for Transport’s Transforming Cities Fund (£5.2 million) and contributions from Gosport Borough Council and local developers (£700,000). It is part of a £56 million initiative to improve travel across the Portsmouth city region, focusing on cycling, pedestrian, and bus enhancements.

______________________________________________________________________

Externiture’s Role

Externiture was selected to design, manufacture, and install the new bus and taxi shelters, acting as a trusted partner to Hampshire County Council and subcontractor to Knights Brown.

Key Deliverables:
  • Bespoke Bus Shelter: A 34-meter-long structure with six passenger bays, integrating modern design and real-time passenger information.
  • Taxi Shelter: Providing comfort and convenience for taxi passengers.
  • Branding and Graphics: Custom design and application.
  • Real-Time Information Technology: Featuring Vix Technology for enhanced passenger experience.

This end-to-end project encompassed concept design, detailed engineering, manufacture, assembly, and on-site installation. Externiture also assumed Construction Design and Management (CDM) responsibility during the initial installation phase, ensuring strict adherence to health and safety standards and managing sub-contractors.

FACT FILE: Construction (Design and Management) Regulations (CDM)

In the UK, under the Construction (Design and Management) Regulations (CDM), the contractor taking on CDM responsibility is a critical role in ensuring the health and safety of a construction project. This duty involves managing risks, coordinating efforts among stakeholders, and ensuring compliance with safety standards from project inception to completion. By assuming CDM responsibility, the contractor ensures that safety is prioritised, making the construction site safer for everyone involved.

______________________________________________________________________

Construction and Challenges

Externiture managed a multi-phase installation process, collaborating with key subcontractors:

  • Hallmark Civil Engineering Ltd: Steel structure installation.
  • Tim Darby Electrical: Electrical cabling for lighting, display screens, and real-time passenger information panels.
  • Kershaw Roofing: Roof installation, including the unique bullnose edge.

Externiture successfully delivered Phase 1 ahead of schedule, enabling Knights Brown to progress seamlessly with the remaining works.

Phase 2 involved the final shelter installations, marking the completion of our contribution to this landmark project.

______________________________________________________________________

Conclusion

The Gosport Interchange Improvement Scheme exemplifies innovative transport infrastructure design that balances sustainability, functionality, and community needs. Externiture is proud to have delivered a key element of this transformative project, showcasing our expertise in design innovation and project management for large-scale developments.

Get in Touch

The Redevelopment Scheme

The redevelopment not only provided enhanced facilities for public transport users but also supported Gosport Borough Council’s Waterfront and Town Centre Supplementary Planning Document (SPD), paving the way for future waterfront developments.

The project involved significant reconfiguration of the existing layout, including:

  • Relocation of the Bus Station: The new bus station was moved to the Falkland Gardens short-stay car park and drop-off/pick-up area.
  • Taxi Rank and Parking Adjustments: The taxi rank and pick-up/drop-off area were shifted to the western section of the former bus station site, ensuring minimal disruption to users.
  • Highway Alterations: A bus-only link was created across the High Street, connecting North and South Cross Streets, with adjustments to maintain access for permitted vehicles, such as emergency services and deliveries.
Key Improvements
    1. Modern Infrastructure:
      • New bus and taxi shelters equipped with seating, lighting, and real-time passenger information.
      • Designs that complement Falkland Gardens and preserve waterfront views.
    2. Enhanced Accessibility and Safety:
      • Pedestrian-prioritised bus link with upgraded crossings and extended crossing times.
    3. Sustainability Features:
      • Biodiversity enhancements and a Construction Environmental Management Plan.
      • Tree replacement to maintain ecological balance.
    4. Economic Impact:
      • Supports the Gosport Waterfront development and improved connectivity for commuters and visitors.

Community and Environmental Impact

The project underscores Hampshire County Council’s commitment to sustainable and community-focused development. Public engagement played a critical role, with feedback shaping the final design. Improved transport connectivity promotes economic growth while reducing carbon emissions.