Case Study

Transforming travel experiences, enhancing public transport and promoting sustainability

New Bus Shelter and Access Improvements at Busy Station

Improving facilities for passengers at the busy bus stop at Leighton Buzzard Railway Station

Client: Central Bedfordshire Council

Key Stakeholders: Leighton Buzzard Railway Station

Contractor: Externiture

Objective: To redesign and upgrade the bus stop infrastructure, improving functionality, passenger safety, and pedestrian accessibility.

Leighton Buzzard Railway Station, a busy hub for commuters and travellers, was experiencing a growing number of multi-modal passengers using both trains and buses. This shift away from car-based transport underscored the need for improved bus passenger facilities. The existing infrastructure was inadequate:

  • A small cantilever shelter with limited seating and protection from the elements.
  • An obstructed pavement caused by passengers waiting or alighting, hindering pedestrian flow.
  • Lack of a raised kerb for easier and safer bus boarding.

 

 

Recognising these challenges, Central Bedfordshire Council and the railway station staff sought a solution to enhance passenger comfort, accessibility and safety, and improve access for bus service operators:

“Leighton Buzzard Railway Station public transport facilities were outdated, tired and in need of a major overhaul. Utilising BSIP funding, we were able to work with Externiture to enhance the bus/rail passenger experience by introducing a higher specification bus shelter, providing a safe and comfortable waiting point, with greater protection from inclement weather. The stopping area for bus services was also upgraded with raised kerbs, levelled bus stopping area and improved road markings. We now have a greatly improved experience for bus users and bus operators.”

Dave Streeton, Senior Public Transport Officer, Central Bedfordshire Council

______________________________________________________________________

Externiture’s Role – Key Deliverables

Externiture implemented a comprehensive plan to:

Key Deliverables:
  • Redesign the bus access layout by creating a buildout, extending into the car park, to provide a dedicated and expanded area for bus passengers while minimising disruption to pedestrian traffic.
  • Install a New 4-Bay Mono Neighbourhood Shelter featuring:
    • Green living roof.
    • Enhanced seating with wireless charging tables across two bays.
    • LED lighting.
    • Enclosed front panels for enhanced weather protection.
    • Re-install existing RTI module.
    • Integrated poster cases and additional graphics.
  • Completely overhaul the road markings to suit the new road layout.
  • Refurbish and relocate the existing shelter to offer passengers shelter at a nearby bus stop.
FACT FILE: Multi-Modal Transport in the UK

Growing Shift Towards Sustainable Transport and Rail & Bus Integration: Over the past decade, there has been a notable increase in the adoption of multi-modal transport in the UK, driven by efforts to reduce carbon emissions and improve urban mobility. Policies encouraging walking, cycling, and public transport use have gained traction. The number of passengers using rail services increased steadily before the COVID-19 pandemic, with many relying on buses, bikes, or walking for their first and last mile. Reports from the ONS indicate a gradual decline in car usage in urban areas as more people turn to active travel and shared mobility solutions; the popularity of e-scooters, cycling schemes, and improved bus services has contributed to this shift.

Future Outlook: Government initiatives, including the National Bus Strategy (2021) and ongoing rail reforms, aim to further improve connectivity between different modes of transport. These steps are critical in meeting the UK’s net-zero carbon goals by 2050.

______________________________________________________________________

Challenges & Solutions 

  1. Passenger Flow During Construction:
    • A temporary bus stop was installed at the end of Old Road, with an accessible diversion route through the car park.
    • The worksite was secured with barriers, ensuring safety for pedestrians and workers.
  2. Traffic Management:
    • Traffic access on Station Road remained live except for the immediate loop near the works.
    • A detailed plan ensured minimal disruption to traffic flow and station operations.
  3. Weather Protection and Accessibility:
    • The new shelter design provided improved weather protection and comfort for passengers with luggage.
    • Raised kerbs facilitated easier boarding for all passengers, including those with mobility challenges and with luggage.

______________________________________________________________________

Outcome

The completed project transformed the bus passenger and bus operator experience at Leighton Buzzard Railway Station. Key benefits included:

  • Enhanced Passenger Comfort: The spacious and well-equipped shelter improved waiting conditions.
  • Improved Safety: Raised kerbs and dedicated pedestrian areas reduced risks.
  • Efficient Use of Space: The buildout reduced pavement congestion without compromising pedestrian pathways.
  • Improved Stopping Area for Bus Services: The raised kerbs, levelled bus stopping area and re-painted road markings have a greatly improved the experience for bus operators.

Get in Touch

PROJECT HIGHLIGHTS

  • Total Groundworks Area: 105 sqm.
  • New Shelter Dimensions: 5.95m x 2.025m.
  • Construction Period: : Groundworks and installation of the Mono Neighbourhood shelter, and the re-siting of the cantilever shelter were completed within 1 week. (Weekdays 8am-4pm)
  • Key Features: Green living roof, LED lighting, wireless charging embedded in seating, integrated graphics and poster cases.

This initiative supports the continued shift towards sustainable, multi-modal transportation while ensuring the comfort and safety of passengers at one of Central Bedfordshire’s key transport nodes.