At Externiture, we pride ourselves on our extensive work with councils across the UK. Among our many projects, the recent bus shelter installation programme in North Petherton, Somerset, stands out as particularly rewarding. The positive feedback from the Town Mayor encapsulates the project’s success:

“I have looked at all the sites over the weekend and as Town Mayor of North Petherton I wanted to write to you personally to say what a fantastic job has been achieved by your team, and so quickly too.” — Cllr. Alan Bradford, Mayor, North Petherton Town Council


Challenges and Solutions

1. Infrastructure and Safety Issues

North Petherton’s existing bus stops presented numerous challenges, such as inadequate shelters, insufficient information display, poor visibility, and accessibility issues for disabled passengers. For instance, the Compass Inn stop had only a pole, causing obstructions on a shared cycle and footway, while Huntworth Lane’s stop was hard to see, overgrown, and unsafe for waiting passengers. Additionally, the Kerland Clinic and Moon Lane stops were inaccessible, lacked shelters, and posed significant safety risks, particularly for wheelchair users.

Solution: Comprehensive Shelter Installation

Externiture undertook a comprehensive approach to address these issues:

  • Enhanced Shelters: High-standard, enclosed shelters were installed at all stops. These shelters included large poster cases for detailed timetables and local information. For instance, the shelter at Compass Inn was positioned on a verge supported by a retaining wall to avoid interference with the cycle/footpath, and the shelter at Huntworth Lane was set back from the road with a new 25-meter pathway for safe access.
  • Accessibility Improvements: All shelters were designed to be fully compliant with the Disability Discrimination Act (DDA). Hardstanding surfaces replaced grass verges, ensuring smooth access for wheelchairs and buggies. At Kerland Clinic, a full-end panel shelter and new hardstanding improved safety and access, while at Moon Lane, a dropped kerb and elevated hardstanding facilitated safe boarding for wheelchair users.
  • Visibility and Safety Enhancements: Tall poles were installed to improve stop visibility, and shelters were set back from kerbs to prevent vehicle impacts. At Compass Inn, the flag was prominently positioned on top of the shelter, and at Moon Lane, the shelter’s location was adjusted to provide clear visibility and increased safety.
  • Additional Features: Each shelter was equipped with ample seating, bins positioned for easy use, and space for future digital displays. For example, Huntworth Lane’s shelter provided a large display area and flexible design for potential modifications, while the Kerland Clinic installation included a reset gully to alleviate water pooling.

2. Coordination and Execution

Executing this project during lockdown restrictions posed additional challenges, particularly in coordinating with key stakeholders and ensuring minimal disruption to traffic and community activities.

Solution: Efficient Project Management

  • Remote Collaboration: Externiture conducted online meetings and maintained constant communication with the Town Council and affected residents, particularly those with specific accessibility needs. This ensured that all concerns were addressed promptly and effectively.
  • Integrated Project Delivery: By managing the entire project—from manufacturing and installation to groundworks—Externiture provided a seamless and efficient service. This integrated approach eliminated the need for multiple suppliers, ensuring consistent quality and simplifying project management for the council.

Conclusion and Results

The North Petherton bus shelter installation project demonstrates Externiture’s dedication to meticulous planning and client-focused solutions. Each unique challenge was addressed through careful research and professional expertise, ensuring the project met both safety and accessibility standards. By serving as the single point-of-contact for the entire project, Externiture streamlined the process, delivering consistent and high-quality results.

The new shelters have had an immediate positive impact, encouraging increased bus use, reducing congestion, and lowering emissions. This project has enhanced public transport accessibility and safety, providing vital social mobility and improving the daily lives of many residents.